

{"id":186456,"date":"2024-08-29T00:11:12","date_gmt":"2024-08-28T22:11:12","guid":{"rendered":"https:\/\/support.wallbox.com\/?post_type=ht_kb&#038;p=186456"},"modified":"2024-08-29T00:11:22","modified_gmt":"2024-08-28T22:11:22","slug":"how-to-install-and-configure-an-mid-meter-with-wallbox-chargers-for-accurate-energy-measurement","status":"publish","type":"ht_kb","link":"https:\/\/support.pre.wallbox.com\/en\/knowledge-base\/how-to-install-and-configure-an-mid-meter-with-wallbox-chargers-for-accurate-energy-measurement\/","title":{"rendered":"How to Install and Configure an MID Meter with Wallbox Chargers for Accurate Energy Measurement"},"content":{"rendered":"\n<p>Installing an MID Meter with y<strong>our Wallbox charger allows for precise and MID-compliant energy consumption measurement, essential for billing and regulatory purposes<\/strong>. This guide provides detailed steps for installing and configuring an MID Meter.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">What is an MID Meter?<\/h3>\n\n\n\n<p>An MID (Measuring Instruments Directive) Meter is a certified power meter that records the energy consumption of your Wallbox charger installation with high accuracy. Complying with the MID standard, it provides precise energy readings, ensuring that you can use this data for billing or reimbursement purposes.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">1. Before Starting: MID Meter and Installation Requirements<\/h2>\n\n\n\n<p>Wallbox supports two types of MID-certified power meters, which can be purchased from our online shop:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li><strong>Three-phase MID power meter<\/strong>: Suitable for three-phase installations (up to 65A).<\/li><li><strong>Single-phase MID power meter<\/strong>: Suitable for single-phase installations (up to 100A).<\/li><\/ul>\n\n\n\n<p><span style=\"box-sizing: border-box; margin: 0px; padding: 0px;\">We recommend using an&nbsp;<strong>STP Cat 5E cable to perform the installation<\/strong>. <\/span><\/p>\n\n\n\n<p><span style=\"box-sizing: border-box; margin: 0px; padding: 0px;\">Before you begin,&nbsp;<\/span><strong><a href=\"https:\/\/support.wallbox.com\/en\/knowledge-base\/how-to-download-the-mywallbox-mobile-app\/\" target=\"_blank\" rel=\"noreferrer noopener\">download the Wallbox App<\/a><\/strong>, <strong><a href=\"https:\/\/support.wallbox.com\/en\/knowledge-base\/how-to-create-a-mywallbox-account-and-log-in-from-the-app\/\" target=\"_blank\" rel=\"noreferrer noopener\">create an account<\/a><\/strong> and <strong><a href=\"https:\/\/support.wallbox.com\/en\/knowledge-base\/how-to-add-your-charger-to-your-account-by-scanning-its-qr-code-with-the-mywallbox-app\/\" target=\"_blank\" rel=\"noreferrer noopener\">add your charger<\/a><\/strong> to complete the configuration.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>2. Installing the MID meter<\/strong><\/h2>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Electrical wiring<\/strong><\/h3>\n\n\n\n<p>The MID Meter should always be installed after the Residual Current Devices (RCDs) and Miniature Circuit Breakers (MCBs) on the charger&#8217;s power line. This is represented as position F on the installation diagram.<\/p>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter\"><img decoding=\"async\" src=\"https:\/\/support.wallbox.com\/wp-content\/uploads\/2022\/12\/MID-METER-INSTALLATION-SCHEMATIC.png\" alt=\"MID-METER-INSTALLATION-SCHEMATIC\"\/><\/figure><\/div>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Communication installation<\/strong> methods<\/h3>\n\n\n\n<p>Depending on the layout of your charging infrastructure, you can choose one of the following communication installation schemes:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li><strong>Bus line installation<\/strong>: Recommended when the Power Boost (PB) and MID Meters are close together. Only one cable is needed to create the bus communication, wired to the RS485 connector.<\/li><\/ul>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter\"><img decoding=\"async\" src=\"https:\/\/support.wallbox.com\/wp-content\/uploads\/2021\/12\/2_Bus-line-1-300x123.png\" alt=\"2_Bus-line-1\"\/><\/figure><\/div>\n\n\n\n<ul class=\"wp-block-list\"><li><strong>Two lines installation:<\/strong> Used when PB and MID Meters are far apart. Two different connection lines are created, both connecting to the same point on the RS485 charger connector.<\/li><\/ul>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter\"><img decoding=\"async\" src=\"https:\/\/support.wallbox.com\/wp-content\/uploads\/2021\/12\/3_Two-lines-3-300x118.png\" alt=\"3_Two-lines-3\"\/><\/figure><\/div>\n\n\n\n<p>The following sections provide step-by-step instructions for three-phase and single-phase MID meter installations.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>A. 3-phase MID meter installation<\/strong><\/h3>\n\n\n\n<p>Refer to the installation guide provided with your MID power meter for additional details. Below are the key steps:<\/p>\n\n\n\n<ol class=\"wp-block-list\"><li><strong>Connecting the Charger to the Meter<\/strong>: Connect the MID Meter to your charger using an STP Cat 5E cable.<\/li><li><strong>Wiring the Power Meter<\/strong>:<\/li><\/ol>\n\n\n\n<ul class=\"wp-block-list\"><li>Connect the three phases (positions 1-2-3 for power input, 4-5-6 for power output).<\/li><li>Ensure the phases are securely anchored. Install the insulation plate on top of the screws.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-ht-blocks-messages wp-block-hb-message wp-block-hb-message--withicon is-style-danger\"><strong>IMPORTANT: <\/strong>Loose screws can create a fire hazard!<\/p>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter\"><img decoding=\"async\" src=\"https:\/\/support.wallbox.com\/wp-content\/uploads\/2021\/12\/4_Step_1_MID_CG_EM340_phases_connected-155x300.png\" alt=\"4_Step_1_MID_CG_EM340_phases_connected\"\/><\/figure><\/div>\n\n\n\n<ul class=\"wp-block-list\"><li>Install the neutral. If larger cable cross-sections are used, downsize the neutral to fit the power meter.<\/li><\/ul>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter\"><img decoding=\"async\" src=\"https:\/\/support.wallbox.com\/wp-content\/uploads\/2021\/12\/5_Step_2_MID_CG_EM340_installing_screw_covers_for_insulation-155x300.png\" alt=\"5_Step_2_MID_CG_EM340_installing_screw_covers_for_insulation\"\/><\/figure><\/div>\n\n\n\n<ul class=\"wp-block-list\"><li>Install the STP communication cable according to the diagram provided in your installation guide.<\/li><\/ul>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter\"><img decoding=\"async\" src=\"https:\/\/support.wallbox.com\/wp-content\/uploads\/2021\/12\/6_Step_3_MID_CG_EM340_installing_the_neuter-155x300.png\" alt=\"6_Step_3_MID_CG_EM340_installing_the_neuter\"\/><\/figure><\/div>\n\n\n\n<p class=\"wp-block-ht-blocks-messages wp-block-hb-message wp-block-hb-message--withicon\"><strong>NOTE<\/strong>: Use an STP Cat 5E or higher cable for the communication line, and ensure the total length does not exceed 500 meters.<\/p>\n\n\n\n<p class=\"wp-block-ht-blocks-messages wp-block-hb-message wp-block-hb-message--withicon is-style-alert\"><strong>IMPORTANT<\/strong>: Do not use one twisted pair for each connection. Untwist the cables before connecting them separately. Use a cable off-cut to loop between positions 7 and 9.<\/p>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter\"><img decoding=\"async\" src=\"https:\/\/support.wallbox.com\/wp-content\/uploads\/2021\/12\/7_Step_4_MID_CG_EM340_installing_the_communication_cable-230x300.png\" alt=\"7_Step_4_MID_CG_EM340_installing_the_communication_cable\"\/><\/figure><\/div>\n\n\n\n<ul class=\"wp-block-list\"><li>Install the cable covers to secure your installation. If required, seal the covers with cables according to the local regulations.<\/li><\/ul>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter\"><img decoding=\"async\" src=\"https:\/\/support.wallbox.com\/wp-content\/uploads\/2021\/12\/8_Step_6_MID_CG_EM340_seal_the_cover-156x300.png\" alt=\"8_Step_6_MID_CG_EM340_seal_the_cover\"\/><\/figure><\/div>\n\n\n\n<ol class=\"wp-block-list\" start=\"3\"><li><strong>Wiring the Charger<\/strong>: Follow the instructions provided in your charger\u2019s installation guide.<\/li><\/ol>\n\n\n\n<ol class=\"wp-block-list\" start=\"4\"><li><strong>Termination Resistance Activation<\/strong>:<\/li><\/ol>\n\n\n\n<ul class=\"wp-block-list\"><li><strong>For Bus Line Installation<\/strong>: Set the charger&#8217;s RS485 switch to the &#8220;T&#8221; position. Only the Power Boost meter needs termination resistance.<\/li><\/ul>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter\"><img decoding=\"async\" src=\"https:\/\/support.wallbox.com\/wp-content\/uploads\/2021\/12\/9_Bus-line-1-300x123.png\" alt=\"\"\/><\/figure><\/div>\n\n\n\n<ul class=\"wp-block-list\"><li><strong><strong>For Two Lines Installation<\/strong><\/strong>: Set the RS485 switch to the &#8220;NT&#8221; position and wire the termination resistance bridge to both MID and PB meters.<\/li><\/ul>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter\"><img decoding=\"async\" src=\"https:\/\/support.wallbox.com\/wp-content\/uploads\/2021\/12\/10_Two-lines-3-300x118.png\" alt=\"\"\/><\/figure><\/div>\n\n\n\n<ol class=\"wp-block-list\" start=\"5\"><li><strong>Current Selector Configuration<\/strong>: Once the MID Meter is installed, configure it through the Wallbox App (instructions in the next section).<\/li><\/ol>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>B. Single-phase MID meter installation<\/strong><\/h3>\n\n\n\n<p>For further assistance, refer to the installation guide included with your MID Meter model.<\/p>\n\n\n\n<ol class=\"wp-block-list\"><li><strong>Connecting the Charger to the Meter<\/strong>: Connect the MID Meter to the charger using an STP Cat 5E cable.<\/li><\/ol>\n\n\n\n<ol class=\"wp-block-list\" start=\"2\"><li><strong>Wiring the MID Power Meter<\/strong>:<\/li><\/ol>\n\n\n\n<ul class=\"wp-block-list\"><li>Install the MID power meter on the DIN rail.<\/li><li><span style=\"color: initial;\">Install the STP communication cable as shown in the diagram.<\/span><\/li><\/ul>\n\n\n\n<p class=\"wp-block-ht-blocks-messages wp-block-hb-message wp-block-hb-message--withicon is-style-danger\"><strong>IMPORTANT<\/strong>: Loose screws can create a fire hazard!<\/p>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter\"><img decoding=\"async\" src=\"https:\/\/support.wallbox.com\/wp-content\/uploads\/2021\/12\/11_EM112_Install_meter_on_DIN_rail-217x300.png\" alt=\"11_EM112_Install_meter_on_DIN_rail\"\/><\/figure><\/div>\n\n\n\n<ul class=\"wp-block-list\" start=\"3\"><li>Connect the phase and neutral wires. Ensure they are securely anchored, then install the insulation plate over the screws.<\/li><\/ul>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter\"><img decoding=\"async\" src=\"https:\/\/support.wallbox.com\/wp-content\/uploads\/2021\/12\/12_EM112_install_phase_and_neuter-165x300.png\" alt=\"12_EM112_install_phase_and_neuter\"\/><\/figure><\/div>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter\"><img decoding=\"async\" src=\"https:\/\/support.wallbox.com\/wp-content\/uploads\/2021\/12\/13_EM112_step_3_installing_covers-165x300.png\" alt=\"13_EM112_step_3_installing_covers\"\/><\/figure><\/div>\n\n\n\n<ul class=\"wp-block-list\"><li>Install the STP communication cable as shown in the diagram.<\/li><\/ul>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter\"><img decoding=\"async\" src=\"https:\/\/support.wallbox.com\/wp-content\/uploads\/2021\/12\/14_EM112_step_4_install_communication_cable-165x300.png\" alt=\"14_EM112_step_4_install_communication_cable\"\/><\/figure><\/div>\n\n\n\n<ul class=\"wp-block-list\"><li>Install the last cable cover to secure your installation. Seal the covers with the cables as required by local regulations.<\/li><\/ul>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter\"><img decoding=\"async\" src=\"https:\/\/support.wallbox.com\/wp-content\/uploads\/2021\/12\/15_EM112_step_5_install_covers___seals-165x300.png\" alt=\"15_EM112_step_5_install_covers___seals\"\/><\/figure><\/div>\n\n\n\n<p class=\"wp-block-ht-blocks-messages wp-block-hb-message wp-block-hb-message--withicon is-style-alert\"><strong>IMPORTANT<\/strong>: Do not use one twisted pair for each connection. Untwist the cables before connecting them separately. Use a cable off-cut to loop between positions 3 and 5.<\/p>\n\n\n\n<ol class=\"wp-block-list\" start=\"3\"><li><strong>Wiring the Charger<\/strong>: Follow the instructions in your charger\u2019s installation guide.<\/li><li><strong>Termination Resistance Activation<\/strong>:<\/li><\/ol>\n\n\n\n<p>Pulsar Plus, Commander 2 and Copper SB have <strong>two different termination resistances. <\/strong>The&nbsp;one devoted to MID and PB meters is marked as<strong> \u201cRS485\u201d<\/strong>.<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li><strong>For Bus Line Installation<\/strong>: Set the charger&#8217;s RS485 switch to the &#8220;T&#8221; position. Only the Power Boost meter needs termination resistance.<\/li><\/ul>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter\"><img decoding=\"async\" src=\"https:\/\/support.wallbox.com\/wp-content\/uploads\/2021\/12\/16_Bus-line-1-300x123.png\" alt=\"16_Bus-line-1\"\/><\/figure><\/div>\n\n\n\n<ul class=\"wp-block-list\"><li><strong>For Two Lines Installation:<\/strong> Set the RS485 switch to the &#8220;NT&#8221; position and wire the termination resistance bridge to both MID and PB meters.<\/li><\/ul>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter\"><img decoding=\"async\" src=\"https:\/\/support.wallbox.com\/wp-content\/uploads\/2021\/12\/17_Two-lines-3-300x118.png\" alt=\"17_Two-lines-3\"\/><\/figure><\/div>\n\n\n\n<ol class=\"wp-block-list\" start=\"5\"><li><strong>Current Selector Configuration<\/strong>: The MID Meter is installed correctly. Proceed to configure it via the Wallbox App as explained below.<\/li><\/ol>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>4. Configuring the MID Meter Through the Wallbox App<\/strong><\/h2>\n\n\n\n<p>To complete the setup and start using your MID Meter for accurate energy measurement, follow these steps in the Wallbox App:<\/p>\n\n\n\n<ol class=\"wp-block-list\"><li><strong>Download and Open the Wallbox App<\/strong>: Ensure you have the latest version of the app from the Play Store or App Store.<\/li><li><strong>Log in to Your Account<\/strong>: Enter your credentials to log in, or register for a new account if you don\u2019t have one.<\/li><li><strong>Select Your Charger<\/strong>: Choose the charger that has the MID Meter installed from the list and connect to it via Bluetooth.<\/li><li><strong>Go to Charger Settings<\/strong>:<ul><li>Navigate to <strong>Settings<\/strong> &gt; <strong>Energy Features<\/strong> &gt; <strong>MID current measurement<\/strong>.<\/li><\/ul><\/li><li><strong>Activate MID Current Measurement<\/strong>: Toggle on the &#8220;MID current measurement&#8221; option.<\/li><li><strong>Enter the MID Meter Serial Number<\/strong>:<ul><li>Tap on the arrow next to the &#8220;MID Meter&#8221; entry.<\/li><li>Enter the last six digits of the MID Meter&#8217;s serial number (found on the sticker below the MID Meter&#8217;s display). If the serial number does not match, it won\u2019t be configured.<\/li><\/ul><\/li><li><strong>Set Auto-Stop Parameters<\/strong>:<ul><li>Define a switch-off limit for charging if the MID connection is lost. Choose between energy (kWh) or time (minutes) for auto-stop configuration.<\/li><li><strong>Default values<\/strong>:<ul><li>kWh: 1 kWh (Max: 22 kWh)<\/li><li>Time: 1 minute (Max: 60 minutes)<\/li><\/ul><\/li><\/ul><\/li><li><strong>Save Settings<\/strong>: Confirm and save your settings. Your MID Meter is now properly configured.<\/li><li><strong>Verify Configuration<\/strong>: Visit the Wallbox portal at <a href=\"https:\/\/my.wallbox.com\/login\">my.wallbox.com\/login<\/a> to check if your MID Meter is configured correctly. The MID Meter icon should appear next to your charger&#8217;s name if everything is set up correctly.<\/li><\/ol>\n\n\n\n<h3 class=\"wp-block-heading\">What is an MID Meter?<\/h3>\n\n\n\n<p>An MID (Measuring Instruments Directive) Meter is a certified power meter that records the energy consumption of your Wallbox charger installation with high accuracy. Complying with the MID standard, it provides precise energy readings, ensuring that you can use this data for billing or reimbursement purposes.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">1. Before Starting: MID Meter and Installation Requirements<\/h2>\n\n\n\n<p>Wallbox supports two types of MID-certified power meters, which can be purchased from our online shop:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li><strong>Three-phase MID power meter<\/strong>: Suitable for three-phase installations (up to 65A).<\/li><li><strong>Single-phase MID power meter<\/strong>: Suitable for single-phase installations (up to 100A).<\/li><\/ul>\n\n\n\n<p><span style=\"box-sizing: border-box; margin: 0px; padding: 0px;\">We recommend using an&nbsp;<strong>STP Cat 5E cable to perform the installation<\/strong>. <\/span><\/p>\n\n\n\n<p><span style=\"box-sizing: border-box; margin: 0px; padding: 0px;\">Before you begin,&nbsp;<\/span><strong><a href=\"https:\/\/support.wallbox.com\/en\/knowledge-base\/how-to-download-the-mywallbox-mobile-app\/\" target=\"_blank\" rel=\"noreferrer noopener\">download the Wallbox App<\/a><\/strong>, <strong><a href=\"https:\/\/support.wallbox.com\/en\/knowledge-base\/how-to-create-a-mywallbox-account-and-log-in-from-the-app\/\" target=\"_blank\" rel=\"noreferrer noopener\">create an account<\/a><\/strong> and <strong><a href=\"https:\/\/support.wallbox.com\/en\/knowledge-base\/how-to-add-your-charger-to-your-account-by-scanning-its-qr-code-with-the-mywallbox-app\/\" target=\"_blank\" rel=\"noreferrer noopener\">add your charger<\/a><\/strong> to complete the configuration.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>2. Installing the MID meter<\/strong><\/h2>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Electrical wiring<\/strong><\/h3>\n\n\n\n<p>The MID Meter should always be installed after the Residual Current Devices (RCDs) and Miniature Circuit Breakers (MCBs) on the charger&#8217;s power line. This is represented as position F on the installation diagram.<\/p>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter\"><img decoding=\"async\" src=\"https:\/\/support.wallbox.com\/wp-content\/uploads\/2022\/12\/MID-METER-INSTALLATION-SCHEMATIC.png\" alt=\"MID-METER-INSTALLATION-SCHEMATIC\"\/><\/figure><\/div>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Communication installation<\/strong> methods<\/h3>\n\n\n\n<p>Depending on the layout of your charging infrastructure, you can choose one of the following communication installation schemes:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li><strong>Bus line installation<\/strong>: Recommended when the Power Boost (PB) and MID Meters are close together. Only one cable is needed to create the bus communication, wired to the RS485 connector.<\/li><\/ul>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter\"><img decoding=\"async\" src=\"https:\/\/support.wallbox.com\/wp-content\/uploads\/2021\/12\/2_Bus-line-1-300x123.png\" alt=\"2_Bus-line-1\"\/><\/figure><\/div>\n\n\n\n<ul class=\"wp-block-list\"><li><strong>Two lines installation:<\/strong> Used when PB and MID Meters are far apart. Two different connection lines are created, both connecting to the same point on the RS485 charger connector.<\/li><\/ul>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter\"><img decoding=\"async\" src=\"https:\/\/support.wallbox.com\/wp-content\/uploads\/2021\/12\/3_Two-lines-3-300x118.png\" alt=\"3_Two-lines-3\"\/><\/figure><\/div>\n\n\n\n<p>The following sections provide step-by-step instructions for three-phase and single-phase MID meter installations.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>A. 3-phase MID meter installation<\/strong><\/h3>\n\n\n\n<p>Refer to the installation guide provided with your MID power meter for additional details. Below are the key steps:<\/p>\n\n\n\n<ol class=\"wp-block-list\"><li><strong>Connecting the Charger to the Meter<\/strong>: Connect the MID Meter to your charger using an STP Cat 5E cable.<\/li><li><strong>Wiring the Power Meter<\/strong>:<\/li><\/ol>\n\n\n\n<ul class=\"wp-block-list\"><li>Connect the three phases (positions 1-2-3 for power input, 4-5-6 for power output).<\/li><li>Ensure the phases are securely anchored. Install the insulation plate on top of the screws.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-ht-blocks-messages wp-block-hb-message wp-block-hb-message--withicon is-style-danger\"><strong>IMPORTANT: <\/strong>Loose screws can create a fire hazard!<\/p>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter\"><img decoding=\"async\" src=\"https:\/\/support.wallbox.com\/wp-content\/uploads\/2021\/12\/4_Step_1_MID_CG_EM340_phases_connected-155x300.png\" alt=\"4_Step_1_MID_CG_EM340_phases_connected\"\/><\/figure><\/div>\n\n\n\n<ul class=\"wp-block-list\"><li>Install the neutral. If larger cable cross-sections are used, downsize the neutral to fit the power meter.<\/li><\/ul>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter\"><img decoding=\"async\" src=\"https:\/\/support.wallbox.com\/wp-content\/uploads\/2021\/12\/5_Step_2_MID_CG_EM340_installing_screw_covers_for_insulation-155x300.png\" alt=\"5_Step_2_MID_CG_EM340_installing_screw_covers_for_insulation\"\/><\/figure><\/div>\n\n\n\n<ul class=\"wp-block-list\"><li>Install the STP communication cable according to the diagram provided in your installation guide.<\/li><\/ul>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter\"><img decoding=\"async\" src=\"https:\/\/support.wallbox.com\/wp-content\/uploads\/2021\/12\/6_Step_3_MID_CG_EM340_installing_the_neuter-155x300.png\" alt=\"6_Step_3_MID_CG_EM340_installing_the_neuter\"\/><\/figure><\/div>\n\n\n\n<p class=\"wp-block-ht-blocks-messages wp-block-hb-message wp-block-hb-message--withicon\"><strong>NOTE<\/strong>: Use an STP Cat 5E or higher cable for the communication line, and ensure the total length does not exceed 500 meters.<\/p>\n\n\n\n<p class=\"wp-block-ht-blocks-messages wp-block-hb-message wp-block-hb-message--withicon is-style-alert\"><strong>IMPORTANT<\/strong>: Do not use one twisted pair for each connection. Untwist the cables before connecting them separately. Use a cable off-cut to loop between positions 7 and 9.<\/p>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter\"><img decoding=\"async\" src=\"https:\/\/support.wallbox.com\/wp-content\/uploads\/2021\/12\/7_Step_4_MID_CG_EM340_installing_the_communication_cable-230x300.png\" alt=\"7_Step_4_MID_CG_EM340_installing_the_communication_cable\"\/><\/figure><\/div>\n\n\n\n<ul class=\"wp-block-list\"><li>Install the cable covers to secure your installation. If required, seal the covers with cables according to the local regulations.<\/li><\/ul>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter\"><img decoding=\"async\" src=\"https:\/\/support.wallbox.com\/wp-content\/uploads\/2021\/12\/8_Step_6_MID_CG_EM340_seal_the_cover-156x300.png\" alt=\"8_Step_6_MID_CG_EM340_seal_the_cover\"\/><\/figure><\/div>\n\n\n\n<ol class=\"wp-block-list\" start=\"3\"><li><strong>Wiring the Charger<\/strong>: Follow the instructions provided in your charger\u2019s installation guide.<\/li><\/ol>\n\n\n\n<ol class=\"wp-block-list\" start=\"4\"><li><strong>Termination Resistance Activation<\/strong>:<\/li><\/ol>\n\n\n\n<ul class=\"wp-block-list\"><li><strong>For Bus Line Installation<\/strong>: Set the charger&#8217;s RS485 switch to the &#8220;T&#8221; position. Only the Power Boost meter needs termination resistance.<\/li><\/ul>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter\"><img decoding=\"async\" src=\"https:\/\/support.wallbox.com\/wp-content\/uploads\/2021\/12\/9_Bus-line-1-300x123.png\" alt=\"\"\/><\/figure><\/div>\n\n\n\n<ul class=\"wp-block-list\"><li><strong><strong>For Two Lines Installation<\/strong><\/strong>: Set the RS485 switch to the &#8220;NT&#8221; position and wire the termination resistance bridge to both MID and PB meters.<\/li><\/ul>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter\"><img decoding=\"async\" src=\"https:\/\/support.wallbox.com\/wp-content\/uploads\/2021\/12\/10_Two-lines-3-300x118.png\" alt=\"\"\/><\/figure><\/div>\n\n\n\n<ol class=\"wp-block-list\" start=\"5\"><li><strong>Current Selector Configuration<\/strong>: Once the MID Meter is installed, configure it through the Wallbox App (instructions in the next section).<\/li><\/ol>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>B. Single-phase MID meter installation<\/strong><\/h3>\n\n\n\n<p>For further assistance, refer to the installation guide included with your MID Meter model.<\/p>\n\n\n\n<ol class=\"wp-block-list\"><li><strong>Connecting the Charger to the Meter<\/strong>: Connect the MID Meter to the charger using an STP Cat 5E cable.<\/li><\/ol>\n\n\n\n<ol class=\"wp-block-list\" start=\"2\"><li><strong>Wiring the MID Power Meter<\/strong>:<\/li><\/ol>\n\n\n\n<ul class=\"wp-block-list\"><li>Install the MID power meter on the DIN rail.<\/li><li><span style=\"color: initial;\">Install the STP communication cable as shown in the diagram.<\/span><\/li><\/ul>\n\n\n\n<p class=\"wp-block-ht-blocks-messages wp-block-hb-message wp-block-hb-message--withicon is-style-danger\"><strong>IMPORTANT<\/strong>: Loose screws can create a fire hazard!<\/p>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter\"><img decoding=\"async\" src=\"https:\/\/support.wallbox.com\/wp-content\/uploads\/2021\/12\/11_EM112_Install_meter_on_DIN_rail-217x300.png\" alt=\"11_EM112_Install_meter_on_DIN_rail\"\/><\/figure><\/div>\n\n\n\n<ul class=\"wp-block-list\" start=\"3\"><li>Connect the phase and neutral wires. Ensure they are securely anchored, then install the insulation plate over the screws.<\/li><\/ul>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter\"><img decoding=\"async\" src=\"https:\/\/support.wallbox.com\/wp-content\/uploads\/2021\/12\/12_EM112_install_phase_and_neuter-165x300.png\" alt=\"12_EM112_install_phase_and_neuter\"\/><\/figure><\/div>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter\"><img decoding=\"async\" src=\"https:\/\/support.wallbox.com\/wp-content\/uploads\/2021\/12\/13_EM112_step_3_installing_covers-165x300.png\" alt=\"13_EM112_step_3_installing_covers\"\/><\/figure><\/div>\n\n\n\n<ul class=\"wp-block-list\"><li>Install the STP communication cable as shown in the diagram.<\/li><\/ul>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter\"><img decoding=\"async\" src=\"https:\/\/support.wallbox.com\/wp-content\/uploads\/2021\/12\/14_EM112_step_4_install_communication_cable-165x300.png\" alt=\"14_EM112_step_4_install_communication_cable\"\/><\/figure><\/div>\n\n\n\n<ul class=\"wp-block-list\"><li>Install the last cable cover to secure your installation. Seal the covers with the cables as required by local regulations.<\/li><\/ul>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter\"><img decoding=\"async\" src=\"https:\/\/support.wallbox.com\/wp-content\/uploads\/2021\/12\/15_EM112_step_5_install_covers___seals-165x300.png\" alt=\"15_EM112_step_5_install_covers___seals\"\/><\/figure><\/div>\n\n\n\n<p class=\"wp-block-ht-blocks-messages wp-block-hb-message wp-block-hb-message--withicon is-style-alert\"><strong>IMPORTANT<\/strong>: Do not use one twisted pair for each connection. Untwist the cables before connecting them separately. Use a cable off-cut to loop between positions 3 and 5.<\/p>\n\n\n\n<ol class=\"wp-block-list\" start=\"3\"><li><strong>Wiring the Charger<\/strong>: Follow the instructions in your charger\u2019s installation guide.<\/li><li><strong>Termination Resistance Activation<\/strong>:<\/li><\/ol>\n\n\n\n<p>Pulsar Plus, Commander 2 and Copper SB have <strong>two different termination resistances. <\/strong>The&nbsp;one devoted to MID and PB meters is marked as<strong> \u201cRS485\u201d<\/strong>.<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li><strong>For Bus Line Installation<\/strong>: Set the charger&#8217;s RS485 switch to the &#8220;T&#8221; position. Only the Power Boost meter needs termination resistance.<\/li><\/ul>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter\"><img decoding=\"async\" src=\"https:\/\/support.wallbox.com\/wp-content\/uploads\/2021\/12\/16_Bus-line-1-300x123.png\" alt=\"16_Bus-line-1\"\/><\/figure><\/div>\n\n\n\n<ul class=\"wp-block-list\"><li><strong>For Two Lines Installation:<\/strong> Set the RS485 switch to the &#8220;NT&#8221; position and wire the termination resistance bridge to both MID and PB meters.<\/li><\/ul>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter\"><img decoding=\"async\" src=\"https:\/\/support.wallbox.com\/wp-content\/uploads\/2021\/12\/17_Two-lines-3-300x118.png\" alt=\"17_Two-lines-3\"\/><\/figure><\/div>\n\n\n\n<ol class=\"wp-block-list\" start=\"5\"><li><strong>Current Selector Configuration<\/strong>: The MID Meter is installed correctly. Proceed to configure it via the Wallbox App as explained below.<\/li><\/ol>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>4. Configuring the MID Meter Through the Wallbox App<\/strong><\/h2>\n\n\n\n<p>To complete the setup and start using your MID Meter for accurate energy measurement, follow these steps in the Wallbox App:<\/p>\n\n\n\n<ol class=\"wp-block-list\"><li><strong>Download and Open the Wallbox App<\/strong>: Ensure you have the latest version of the app from the Play Store or App Store.<\/li><li><strong>Log in to Your Account<\/strong>: Enter your credentials to log in, or register for a new account if you don\u2019t have one.<\/li><li><strong>Select Your Charger<\/strong>: Choose the charger that has the MID Meter installed from the list and connect to it via Bluetooth.<\/li><li><strong>Go to Charger Settings<\/strong>:<ul><li>Navigate to <strong>Settings<\/strong> &gt; <strong>Energy Features<\/strong> &gt; <strong>MID current measurement<\/strong>.<\/li><\/ul><\/li><li><strong>Activate MID Current Measurement<\/strong>: Toggle on the &#8220;MID current measurement&#8221; option.<\/li><li><strong>Enter the MID Meter Serial Number<\/strong>:<ul><li>Tap on the arrow next to the &#8220;MID Meter&#8221; entry.<\/li><li>Enter the last six digits of the MID Meter&#8217;s serial number (found on the sticker below the MID Meter&#8217;s display). If the serial number does not match, it won\u2019t be configured.<\/li><\/ul><\/li><li><strong>Set Auto-Stop Parameters<\/strong>:<ul><li>Define a switch-off limit for charging if the MID connection is lost. Choose between energy (kWh) or time (minutes) for auto-stop configuration.<\/li><li><strong>Default values<\/strong>:<ul><li>kWh: 1 kWh (Max: 22 kWh)<\/li><li>Time: 1 minute (Max: 60 minutes)<\/li><\/ul><\/li><\/ul><\/li><li><strong>Save Settings<\/strong>: Confirm and save your settings. Your MID Meter is now properly configured.<\/li><li><strong>Verify Configuration<\/strong>: Visit the Wallbox portal at <a href=\"https:\/\/my.wallbox.com\/login\">my.wallbox.com\/login<\/a> to check if your MID Meter is configured correctly. The MID Meter icon should appear next to your charger&#8217;s name if everything is set up correctly.<\/li><\/ol>\n\n\n\n<p>Installing an MID Meter with y<strong>our Wallbox charger allows for precise and MID-compliant energy consumption measurement, essential for billing and regulatory purposes<\/strong>. This guide provides detailed steps for installing and configuring an MID Meter.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">What is an MID Meter?<\/h3>\n\n\n\n<p>An MID (Measuring Instruments Directive) Meter is a certified power meter that records the energy consumption of your Wallbox charger installation with high accuracy. Complying with the MID standard, it provides precise energy readings, ensuring that you can use this data for billing or reimbursement purposes.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">1. Before Starting: MID Meter and Installation Requirements<\/h2>\n\n\n\n<p>Wallbox supports two types of MID-certified power meters, which can be purchased from our online shop:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li><strong>Three-phase MID power meter<\/strong>: Suitable for three-phase installations (up to 65A).<\/li><li><strong>Single-phase MID power meter<\/strong>: Suitable for single-phase installations (up to 100A).<\/li><\/ul>\n\n\n\n<p><span style=\"box-sizing: border-box; margin: 0px; padding: 0px;\">We recommend using an&nbsp;<strong>STP Cat 5E cable to perform the installation<\/strong>. <\/span><\/p>\n\n\n\n<p><span style=\"box-sizing: border-box; margin: 0px; padding: 0px;\">Before you begin,&nbsp;<\/span><strong><a href=\"https:\/\/support.wallbox.com\/en\/knowledge-base\/how-to-download-the-mywallbox-mobile-app\/\" target=\"_blank\" rel=\"noreferrer noopener\">download the Wallbox App<\/a><\/strong>, <strong><a href=\"https:\/\/support.wallbox.com\/en\/knowledge-base\/how-to-create-a-mywallbox-account-and-log-in-from-the-app\/\" target=\"_blank\" rel=\"noreferrer noopener\">create an account<\/a><\/strong> and <strong><a href=\"https:\/\/support.wallbox.com\/en\/knowledge-base\/how-to-add-your-charger-to-your-account-by-scanning-its-qr-code-with-the-mywallbox-app\/\" target=\"_blank\" rel=\"noreferrer noopener\">add your charger<\/a><\/strong> to complete the configuration.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>2. Installing the MID meter<\/strong><\/h2>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Electrical wiring<\/strong><\/h3>\n\n\n\n<p>The MID Meter should always be installed after the Residual Current Devices (RCDs) and Miniature Circuit Breakers (MCBs) on the charger&#8217;s power line. This is represented as position G on the installation diagram.<\/p>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter\"><img decoding=\"async\" src=\"https:\/\/support.wallbox.com\/wp-content\/uploads\/2022\/12\/MID-METER-INSTALLATION-SCHEMATIC.png\" alt=\"MID-METER-INSTALLATION-SCHEMATIC\"\/><\/figure><\/div>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Communication installation<\/strong> methods<\/h3>\n\n\n\n<p>Depending on the layout of your charging infrastructure, you can choose one of the following communication installation schemes:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li><strong>Bus line installation<\/strong>: Recommended when the Power Boost (PB) and MID Meters are close together. Only one cable is needed to create the bus communication, wired to the RS485 connector.<\/li><\/ul>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter\"><img decoding=\"async\" src=\"https:\/\/support.wallbox.com\/wp-content\/uploads\/2021\/12\/2_Bus-line-1-300x123.png\" alt=\"2_Bus-line-1\"\/><\/figure><\/div>\n\n\n\n<ul class=\"wp-block-list\"><li><strong>Two lines installation:<\/strong> Used when PB and MID Meters are far apart. Two different connection lines are created, both connecting to the same point on the RS485 charger connector.<\/li><\/ul>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter\"><img decoding=\"async\" src=\"https:\/\/support.wallbox.com\/wp-content\/uploads\/2021\/12\/3_Two-lines-3-300x118.png\" alt=\"3_Two-lines-3\"\/><\/figure><\/div>\n\n\n\n<p>The following sections provide step-by-step instructions for three-phase and single-phase MID meter installations.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>A. 3-phase MID meter installation<\/strong><\/h3>\n\n\n\n<p>Refer to the installation guide provided with your MID power meter for additional details. Below are the key steps:<\/p>\n\n\n\n<ol class=\"wp-block-list\"><li><strong>Connecting the Charger to the Meter<\/strong>: Connect the MID Meter to your charger using an STP Cat 5E cable.<\/li><li><strong>Wiring the Power Meter<\/strong>:<\/li><\/ol>\n\n\n\n<ul class=\"wp-block-list\"><li>Connect the three phases (positions 1-2-3 for power input, 4-5-6 for power output).<\/li><li>Ensure the phases are securely anchored. Install the insulation plate on top of the screws.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-ht-blocks-messages wp-block-hb-message wp-block-hb-message--withicon is-style-danger\"><strong>IMPORTANT: <\/strong>Loose screws can create a fire hazard!<\/p>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter\"><img decoding=\"async\" src=\"https:\/\/support.wallbox.com\/wp-content\/uploads\/2021\/12\/4_Step_1_MID_CG_EM340_phases_connected-155x300.png\" alt=\"4_Step_1_MID_CG_EM340_phases_connected\"\/><\/figure><\/div>\n\n\n\n<ul class=\"wp-block-list\"><li>Install the neutral. If larger cable cross-sections are used, downsize the neutral to fit the power meter.<\/li><\/ul>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter\"><img decoding=\"async\" src=\"https:\/\/support.wallbox.com\/wp-content\/uploads\/2021\/12\/5_Step_2_MID_CG_EM340_installing_screw_covers_for_insulation-155x300.png\" alt=\"5_Step_2_MID_CG_EM340_installing_screw_covers_for_insulation\"\/><\/figure><\/div>\n\n\n\n<ul class=\"wp-block-list\"><li>Install the STP communication cable according to the diagram provided in your installation guide.<\/li><\/ul>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter\"><img decoding=\"async\" src=\"https:\/\/support.wallbox.com\/wp-content\/uploads\/2021\/12\/6_Step_3_MID_CG_EM340_installing_the_neuter-155x300.png\" alt=\"6_Step_3_MID_CG_EM340_installing_the_neuter\"\/><\/figure><\/div>\n\n\n\n<p class=\"wp-block-ht-blocks-messages wp-block-hb-message wp-block-hb-message--withicon\"><strong>NOTE<\/strong>: Use an STP Cat 5E or higher cable for the communication line, and ensure the total length does not exceed 500 meters.<\/p>\n\n\n\n<p class=\"wp-block-ht-blocks-messages wp-block-hb-message wp-block-hb-message--withicon is-style-alert\"><strong>IMPORTANT<\/strong>: Do not use one twisted pair for each connection. Untwist the cables before connecting them separately. Use a cable off-cut to loop between positions 7 and 9.<\/p>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter\"><img decoding=\"async\" src=\"https:\/\/support.wallbox.com\/wp-content\/uploads\/2021\/12\/7_Step_4_MID_CG_EM340_installing_the_communication_cable-230x300.png\" alt=\"7_Step_4_MID_CG_EM340_installing_the_communication_cable\"\/><\/figure><\/div>\n\n\n\n<ul class=\"wp-block-list\"><li>Install the cable covers to secure your installation. If required, seal the covers with cables according to the local regulations.<\/li><\/ul>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter\"><img decoding=\"async\" src=\"https:\/\/support.wallbox.com\/wp-content\/uploads\/2021\/12\/8_Step_6_MID_CG_EM340_seal_the_cover-156x300.png\" alt=\"8_Step_6_MID_CG_EM340_seal_the_cover\"\/><\/figure><\/div>\n\n\n\n<ol class=\"wp-block-list\" start=\"3\"><li><strong>Wiring the Charger<\/strong>: Follow the instructions provided in your charger\u2019s installation guide.<\/li><\/ol>\n\n\n\n<ol class=\"wp-block-list\" start=\"4\"><li><strong>Termination Resistance Activation<\/strong>:<\/li><\/ol>\n\n\n\n<ul class=\"wp-block-list\"><li><strong>For Bus Line Installation<\/strong>: Set the charger&#8217;s RS485 switch to the &#8220;T&#8221; position. Only the Power Boost meter needs termination resistance.<\/li><\/ul>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter\"><img decoding=\"async\" src=\"https:\/\/support.wallbox.com\/wp-content\/uploads\/2021\/12\/9_Bus-line-1-300x123.png\" alt=\"\"\/><\/figure><\/div>\n\n\n\n<ul class=\"wp-block-list\"><li><strong><strong>For Two Lines Installation<\/strong><\/strong>: Set the RS485 switch to the &#8220;NT&#8221; position and wire the termination resistance bridge to both MID and PB meters.<\/li><\/ul>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter\"><img decoding=\"async\" src=\"https:\/\/support.wallbox.com\/wp-content\/uploads\/2021\/12\/10_Two-lines-3-300x118.png\" alt=\"\"\/><\/figure><\/div>\n\n\n\n<ol class=\"wp-block-list\" start=\"5\"><li><strong>Current Selector Configuration<\/strong>: Once the MID Meter is installed, configure it through the Wallbox App (instructions in the next section).<\/li><\/ol>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>B. Single-phase MID meter installation<\/strong><\/h3>\n\n\n\n<p>For further assistance, refer to the installation guide included with your MID Meter model.<\/p>\n\n\n\n<ol class=\"wp-block-list\"><li><strong>Connecting the Charger to the Meter<\/strong>: Connect the MID Meter to the charger using an STP Cat 5E cable.<\/li><\/ol>\n\n\n\n<ol class=\"wp-block-list\" start=\"2\"><li><strong>Wiring the MID Power Meter<\/strong>:<\/li><\/ol>\n\n\n\n<ul class=\"wp-block-list\"><li>Install the MID power meter on the DIN rail.<\/li><li><span style=\"color: initial;\">Install the STP communication cable as shown in the diagram.<\/span><\/li><\/ul>\n\n\n\n<p class=\"wp-block-ht-blocks-messages wp-block-hb-message wp-block-hb-message--withicon is-style-danger\"><strong>IMPORTANT<\/strong>: Loose screws can create a fire hazard!<\/p>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter\"><img decoding=\"async\" src=\"https:\/\/support.wallbox.com\/wp-content\/uploads\/2021\/12\/11_EM112_Install_meter_on_DIN_rail-217x300.png\" alt=\"11_EM112_Install_meter_on_DIN_rail\"\/><\/figure><\/div>\n\n\n\n<ul class=\"wp-block-list\" start=\"3\"><li>Connect the phase and neutral wires. Ensure they are securely anchored, then install the insulation plate over the screws.<\/li><\/ul>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter\"><img decoding=\"async\" src=\"https:\/\/support.wallbox.com\/wp-content\/uploads\/2021\/12\/12_EM112_install_phase_and_neuter-165x300.png\" alt=\"12_EM112_install_phase_and_neuter\"\/><\/figure><\/div>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter\"><img decoding=\"async\" src=\"https:\/\/support.wallbox.com\/wp-content\/uploads\/2021\/12\/13_EM112_step_3_installing_covers-165x300.png\" alt=\"13_EM112_step_3_installing_covers\"\/><\/figure><\/div>\n\n\n\n<ul class=\"wp-block-list\"><li>Install the STP communication cable as shown in the diagram.<\/li><\/ul>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter\"><img decoding=\"async\" src=\"https:\/\/support.wallbox.com\/wp-content\/uploads\/2021\/12\/14_EM112_step_4_install_communication_cable-165x300.png\" alt=\"14_EM112_step_4_install_communication_cable\"\/><\/figure><\/div>\n\n\n\n<ul class=\"wp-block-list\"><li>Install the last cable cover to secure your installation. Seal the covers with the cables as required by local regulations.<\/li><\/ul>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter\"><img decoding=\"async\" src=\"https:\/\/support.wallbox.com\/wp-content\/uploads\/2021\/12\/15_EM112_step_5_install_covers___seals-165x300.png\" alt=\"15_EM112_step_5_install_covers___seals\"\/><\/figure><\/div>\n\n\n\n<p class=\"wp-block-ht-blocks-messages wp-block-hb-message wp-block-hb-message--withicon is-style-alert\"><strong>IMPORTANT<\/strong>: Do not use one twisted pair for each connection. Untwist the cables before connecting them separately. Use a cable off-cut to loop between positions 3 and 5.<\/p>\n\n\n\n<ol class=\"wp-block-list\" start=\"3\"><li><strong>Wiring the Charger<\/strong>: Follow the instructions in your charger\u2019s installation guide.<\/li><li><strong>Termination Resistance Activation<\/strong>:<\/li><\/ol>\n\n\n\n<p>Pulsar Plus, Commander 2 and Copper SB have <strong>two different termination resistances. <\/strong>The&nbsp;one devoted to MID and PB meters is marked as<strong> \u201cRS485\u201d<\/strong>.<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li><strong>For Bus Line Installation<\/strong>: Set the charger&#8217;s RS485 switch to the &#8220;T&#8221; position. Only the Power Boost meter needs termination resistance.<\/li><\/ul>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter\"><img decoding=\"async\" src=\"https:\/\/support.wallbox.com\/wp-content\/uploads\/2021\/12\/16_Bus-line-1-300x123.png\" alt=\"16_Bus-line-1\"\/><\/figure><\/div>\n\n\n\n<ul class=\"wp-block-list\"><li><strong>For Two Lines Installation:<\/strong> Set the RS485 switch to the &#8220;NT&#8221; position and wire the termination resistance bridge to both MID and PB meters.<\/li><\/ul>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter\"><img decoding=\"async\" src=\"https:\/\/support.wallbox.com\/wp-content\/uploads\/2021\/12\/17_Two-lines-3-300x118.png\" alt=\"17_Two-lines-3\"\/><\/figure><\/div>\n\n\n\n<ol class=\"wp-block-list\" start=\"5\"><li><strong>Current Selector Configuration<\/strong>: The MID Meter is installed correctly. Proceed to configure it via the Wallbox App as explained below.<\/li><\/ol>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>4. Configuring the MID Meter Through the Wallbox App<\/strong><\/h2>\n\n\n\n<p>To complete the setup and start using your MID Meter for accurate energy measurement, follow these steps in the Wallbox App:<\/p>\n\n\n\n<ol class=\"wp-block-list\"><li><strong>Download and Open the Wallbox App<\/strong>: Ensure you have the latest version of the app from the Play Store or App Store.<\/li><li><strong>Log in to Your Account<\/strong>: Enter your credentials to log in, or register for a new account if you don\u2019t have one.<\/li><li><strong>Select Your Charger<\/strong>: Choose the charger that has the MID Meter installed from the list and connect to it via Bluetooth.<\/li><li><strong>Go to Charger Settings<\/strong>:<ul><li>Navigate to <strong>Settings<\/strong> > <strong>Energy Features<\/strong> > <strong>MID current measurement<\/strong>.<\/li><\/ul><\/li><li><strong>Activate MID Current Measurement<\/strong>: Toggle on the &#8220;MID current measurement&#8221; option.<\/li><li><strong>Enter the MID Meter Serial Number<\/strong>:<ul><li>Tap on the arrow next to the &#8220;MID Meter&#8221; entry.<\/li><li>Enter the last six digits of the MID Meter&#8217;s serial number (found on the sticker below the MID Meter&#8217;s display). If the serial number does not match, it won\u2019t be configured.<\/li><\/ul><\/li><li><strong>Set Auto-Stop Parameters<\/strong>:<ul><li>Define a switch-off limit for charging if the MID connection is lost. Choose between energy (kWh) or time (minutes) for auto-stop configuration.<\/li><li><strong>Default values<\/strong>:<ul><li>kWh: 1 kWh (Max: 22 kWh)<\/li><li>Time: 1 minute (Max: 60 minutes)<\/li><\/ul><\/li><\/ul><\/li><li><strong>Save Settings<\/strong>: Confirm and save your settings. Your MID Meter is now properly configured.<\/li><li><strong>Verify Configuration<\/strong>: Visit the Wallbox portal at <a href=\"https:\/\/my.wallbox.com\/login\">my.wallbox.com\/login<\/a> to check if your MID Meter is configured correctly. If everything is set up correctly, the MID Meter icon should appear next to your charger&#8217;s name.<\/li><\/ol>\n","protected":false},"excerpt":{"rendered":"<p>Installing an MID Meter with your Wallbox charger allows for precise and MID-compliant energy consumption measurement, essential for billing and&#8230;<\/p>\n","protected":false},"author":12,"comment_status":"closed","ping_status":"closed","template":"","format":"standard","meta":{"inline_featured_image":false,"footnotes":""},"ht-kb-category":[49,1528,8077,9773],"ht-kb-tag":[],"class_list":["post-186456","ht_kb","type-ht_kb","status-publish","format-standard","hentry","ht_kb_category-mywallbox-app","ht_kb_category-mid-meters","ht_kb_category-wallbox-portal","ht_kb_category-help-articles"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v18.6 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Installating and configuring your MID power meter - Wallbox Help Center<\/title>\n<meta name=\"description\" content=\"Follow the steps by steps instructions in this article to install and configure an MID Meter for 3-phase or 1-phase.\" \/>\n<meta name=\"robots\" content=\"noindex, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Installating and configuring your MID power meter - Wallbox Help Center\" \/>\n<meta property=\"og:description\" content=\"Follow the steps by steps instructions in this article to install and configure an MID Meter for 3-phase or 1-phase.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/support.pre.wallbox.com\/en\/knowledge-base\/how-to-install-and-configure-an-mid-meter-with-wallbox-chargers-for-accurate-energy-measurement\/\" \/>\n<meta property=\"og:site_name\" content=\"Wallbox Help Center\" \/>\n<meta property=\"article:modified_time\" content=\"2024-08-28T22:11:22+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/support.wallbox.com\/wp-content\/uploads\/2022\/12\/MID-METER-INSTALLATION-SCHEMATIC.png\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"25 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebSite\",\"@id\":\"https:\/\/support.pre.wallbox.com\/en\/#website\",\"url\":\"https:\/\/support.pre.wallbox.com\/en\/\",\"name\":\"Wallbox Help Center\",\"description\":\"Get help for our products &amp; digital solutions\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/support.pre.wallbox.com\/en\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-GB\"},{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/support.pre.wallbox.com\/en\/knowledge-base\/how-to-install-and-configure-an-mid-meter-with-wallbox-chargers-for-accurate-energy-measurement\/#primaryimage\",\"inLanguage\":\"en-GB\",\"url\":\"https:\/\/support.pre.wallbox.com\/wp-content\/uploads\/2022\/12\/MID-METER-INSTALLATION-SCHEMATIC.png\",\"contentUrl\":\"https:\/\/support.pre.wallbox.com\/wp-content\/uploads\/2022\/12\/MID-METER-INSTALLATION-SCHEMATIC.png\",\"width\":600,\"height\":699,\"caption\":\"MID-METER-INSTALLATIONSSKEMA\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/support.pre.wallbox.com\/en\/knowledge-base\/how-to-install-and-configure-an-mid-meter-with-wallbox-chargers-for-accurate-energy-measurement\/#webpage\",\"url\":\"https:\/\/support.pre.wallbox.com\/en\/knowledge-base\/how-to-install-and-configure-an-mid-meter-with-wallbox-chargers-for-accurate-energy-measurement\/\",\"name\":\"Installating and configuring your MID power meter - Wallbox Help Center\",\"isPartOf\":{\"@id\":\"https:\/\/support.pre.wallbox.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/support.pre.wallbox.com\/en\/knowledge-base\/how-to-install-and-configure-an-mid-meter-with-wallbox-chargers-for-accurate-energy-measurement\/#primaryimage\"},\"datePublished\":\"2024-08-28T22:11:12+00:00\",\"dateModified\":\"2024-08-28T22:11:22+00:00\",\"description\":\"Follow the steps by steps instructions in this article to install and configure an MID Meter for 3-phase or 1-phase.\",\"breadcrumb\":{\"@id\":\"https:\/\/support.pre.wallbox.com\/en\/knowledge-base\/how-to-install-and-configure-an-mid-meter-with-wallbox-chargers-for-accurate-energy-measurement\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/support.pre.wallbox.com\/en\/knowledge-base\/how-to-install-and-configure-an-mid-meter-with-wallbox-chargers-for-accurate-energy-measurement\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/support.pre.wallbox.com\/en\/knowledge-base\/how-to-install-and-configure-an-mid-meter-with-wallbox-chargers-for-accurate-energy-measurement\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/support.pre.wallbox.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Articles\",\"item\":\"https:\/\/support.pre.wallbox.com\/en\/knowledge-base\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"How to Install and Configure an MID Meter with Wallbox Chargers for Accurate Energy Measurement\"}]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Installating and configuring your MID power meter - Wallbox Help Center","description":"Follow the steps by steps instructions in this article to install and configure an MID Meter for 3-phase or 1-phase.","robots":{"index":"noindex","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"og_locale":"en_GB","og_type":"article","og_title":"Installating and configuring your MID power meter - Wallbox Help Center","og_description":"Follow the steps by steps instructions in this article to install and configure an MID Meter for 3-phase or 1-phase.","og_url":"https:\/\/support.pre.wallbox.com\/en\/knowledge-base\/how-to-install-and-configure-an-mid-meter-with-wallbox-chargers-for-accurate-energy-measurement\/","og_site_name":"Wallbox Help Center","article_modified_time":"2024-08-28T22:11:22+00:00","og_image":[{"url":"https:\/\/support.wallbox.com\/wp-content\/uploads\/2022\/12\/MID-METER-INSTALLATION-SCHEMATIC.png"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"25 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebSite","@id":"https:\/\/support.pre.wallbox.com\/en\/#website","url":"https:\/\/support.pre.wallbox.com\/en\/","name":"Wallbox Help Center","description":"Get help for our products &amp; digital solutions","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/support.pre.wallbox.com\/en\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-GB"},{"@type":"ImageObject","@id":"https:\/\/support.pre.wallbox.com\/en\/knowledge-base\/how-to-install-and-configure-an-mid-meter-with-wallbox-chargers-for-accurate-energy-measurement\/#primaryimage","inLanguage":"en-GB","url":"https:\/\/support.pre.wallbox.com\/wp-content\/uploads\/2022\/12\/MID-METER-INSTALLATION-SCHEMATIC.png","contentUrl":"https:\/\/support.pre.wallbox.com\/wp-content\/uploads\/2022\/12\/MID-METER-INSTALLATION-SCHEMATIC.png","width":600,"height":699,"caption":"MID-METER-INSTALLATIONSSKEMA"},{"@type":"WebPage","@id":"https:\/\/support.pre.wallbox.com\/en\/knowledge-base\/how-to-install-and-configure-an-mid-meter-with-wallbox-chargers-for-accurate-energy-measurement\/#webpage","url":"https:\/\/support.pre.wallbox.com\/en\/knowledge-base\/how-to-install-and-configure-an-mid-meter-with-wallbox-chargers-for-accurate-energy-measurement\/","name":"Installating and configuring your MID power meter - Wallbox Help Center","isPartOf":{"@id":"https:\/\/support.pre.wallbox.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/support.pre.wallbox.com\/en\/knowledge-base\/how-to-install-and-configure-an-mid-meter-with-wallbox-chargers-for-accurate-energy-measurement\/#primaryimage"},"datePublished":"2024-08-28T22:11:12+00:00","dateModified":"2024-08-28T22:11:22+00:00","description":"Follow the steps by steps instructions in this article to install and configure an MID Meter for 3-phase or 1-phase.","breadcrumb":{"@id":"https:\/\/support.pre.wallbox.com\/en\/knowledge-base\/how-to-install-and-configure-an-mid-meter-with-wallbox-chargers-for-accurate-energy-measurement\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/support.pre.wallbox.com\/en\/knowledge-base\/how-to-install-and-configure-an-mid-meter-with-wallbox-chargers-for-accurate-energy-measurement\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/support.pre.wallbox.com\/en\/knowledge-base\/how-to-install-and-configure-an-mid-meter-with-wallbox-chargers-for-accurate-energy-measurement\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/support.pre.wallbox.com\/en\/"},{"@type":"ListItem","position":2,"name":"Articles","item":"https:\/\/support.pre.wallbox.com\/en\/knowledge-base\/"},{"@type":"ListItem","position":3,"name":"How to Install and Configure an MID Meter with Wallbox Chargers for Accurate Energy Measurement"}]}]}},"_links":{"self":[{"href":"https:\/\/support.pre.wallbox.com\/en\/wp-json\/wp\/v2\/ht-kb\/186456","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/support.pre.wallbox.com\/en\/wp-json\/wp\/v2\/ht-kb"}],"about":[{"href":"https:\/\/support.pre.wallbox.com\/en\/wp-json\/wp\/v2\/types\/ht_kb"}],"author":[{"embeddable":true,"href":"https:\/\/support.pre.wallbox.com\/en\/wp-json\/wp\/v2\/users\/12"}],"replies":[{"embeddable":true,"href":"https:\/\/support.pre.wallbox.com\/en\/wp-json\/wp\/v2\/comments?post=186456"}],"version-history":[{"count":1,"href":"https:\/\/support.pre.wallbox.com\/en\/wp-json\/wp\/v2\/ht-kb\/186456\/revisions"}],"predecessor-version":[{"id":186459,"href":"https:\/\/support.pre.wallbox.com\/en\/wp-json\/wp\/v2\/ht-kb\/186456\/revisions\/186459"}],"wp:attachment":[{"href":"https:\/\/support.pre.wallbox.com\/en\/wp-json\/wp\/v2\/media?parent=186456"}],"wp:term":[{"taxonomy":"ht_kb_category","embeddable":true,"href":"https:\/\/support.pre.wallbox.com\/en\/wp-json\/wp\/v2\/ht-kb-category?post=186456"},{"taxonomy":"ht_kb_tag","embeddable":true,"href":"https:\/\/support.pre.wallbox.com\/en\/wp-json\/wp\/v2\/ht-kb-tag?post=186456"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}